Lot

4

Gelatin Bio Reactor

In Nutra Equipment - TX/FL

This auction is live! You need to be registered and approved to bid at this auction.
You have been outbid. For the best chance of winning, increase your maximum bid.
Your bid or registration is pending approval with the auctioneer. Please check your email account for more details.
Unfortunately, your registration has been declined by the auctioneer. You can contact the auctioneer on 818-495-3038 for more information.
You are the current highest bidder! To be sure to win, come back on as the lot closes or increase your max bid.
Leave a bid now! Your registration has been successful.
Sorry, bidding has ended on this item. We have thousands of new lots everyday, start a new search.
Bidding on this auction has not started. Please register now so you are approved to bid when auction starts.
1/21
Gelatin Bio Reactor - Image 1 of 21
Gelatin Bio Reactor - Image 2 of 21
Gelatin Bio Reactor - Image 3 of 21
Gelatin Bio Reactor - Image 4 of 21
Gelatin Bio Reactor - Image 5 of 21
Gelatin Bio Reactor - Image 6 of 21
Gelatin Bio Reactor - Image 7 of 21
Gelatin Bio Reactor - Image 8 of 21
Gelatin Bio Reactor - Image 9 of 21
Gelatin Bio Reactor - Image 10 of 21
Gelatin Bio Reactor - Image 11 of 21
Gelatin Bio Reactor - Image 12 of 21
Gelatin Bio Reactor - Image 13 of 21
Gelatin Bio Reactor - Image 14 of 21
Gelatin Bio Reactor - Image 15 of 21
Gelatin Bio Reactor - Image 16 of 21
Gelatin Bio Reactor - Image 17 of 21
Gelatin Bio Reactor - Image 18 of 21
Gelatin Bio Reactor - Image 19 of 21
Gelatin Bio Reactor - Image 20 of 21
Gelatin Bio Reactor - Image 21 of 21
Gelatin Bio Reactor - Image 1 of 21
Gelatin Bio Reactor - Image 2 of 21
Gelatin Bio Reactor - Image 3 of 21
Gelatin Bio Reactor - Image 4 of 21
Gelatin Bio Reactor - Image 5 of 21
Gelatin Bio Reactor - Image 6 of 21
Gelatin Bio Reactor - Image 7 of 21
Gelatin Bio Reactor - Image 8 of 21
Gelatin Bio Reactor - Image 9 of 21
Gelatin Bio Reactor - Image 10 of 21
Gelatin Bio Reactor - Image 11 of 21
Gelatin Bio Reactor - Image 12 of 21
Gelatin Bio Reactor - Image 13 of 21
Gelatin Bio Reactor - Image 14 of 21
Gelatin Bio Reactor - Image 15 of 21
Gelatin Bio Reactor - Image 16 of 21
Gelatin Bio Reactor - Image 17 of 21
Gelatin Bio Reactor - Image 18 of 21
Gelatin Bio Reactor - Image 19 of 21
Gelatin Bio Reactor - Image 20 of 21
Gelatin Bio Reactor - Image 21 of 21
Auctioneer has chosen not to publish the price of this lot
., Texas
10.25%
18.00%

1- Gelatin Bio Reactor


No Mezzanine
Vacuum pressure in the vessel: 0.02-0.09 Mpa.
Working pressure in the vessel: 0.03-0.05 Mpa.
Examining Pressure in the vessel: 0.3-0.4 Mpa.
Working pressure in the jacket: 0.03-0.098 Mpa
Working temperature in tank: 50-100 ℃
Conveyor granule: 30 CP
Sealing parts and ring can be used for more than 3,000 continuous hours
The insulating layer uses super-fine glass cotton.
Inner vessel and insulation layer (covered layer) of the Tank, those sections exposed to raw materials are made of 1Cr18Ni9Ti stainless steel.
The jacket of the GDU uses high-quality steel.
The GDU and all stainless steel parts are well-polished.

General Information:


After ingredients are combined, the mixture is placed into a reactor called a Gelatin melter. The reactor surrounded by a thermal jacket heats the mixture while a very high torque turbine mixer stirs it under vacuum. At this stage, approximately 20% of gelatin mixture consists of water. 

Bioreactor design is a relatively complex engineering task, which is studied in the discipline of biochemical/bioprocess engineering. Under optimum conditions, the microorganisms or cells are able to perform their desired function with a limited production of impurities. The environmental conditions inside the bioreactor, such as temperature, nutrient concentrations, pH, and dissolved gases (especially oxygen for aerobic fermentation) affect the growth and productivity of the organisms. The temperature of the fermentation medium is maintained by a cooling jacket, coils, or both. Particularly exothermic fermentations may require the use of external heat exchangers. Nutrients may be continuously added to the fermenter, as in a fed-batch system, or maybe charged into the reactor at the beginning of fermentation.

RSQ II Coil Pipe Type Water Heater
Model: RSQ-II
Volume: 300 L
Temp. Control Range: 0-100 Degrees C
Mfg. Date: 2016-03
Product Code: 160308
Hot water volume: 2,000 kgs/h
Power consumption: 18 Kw; 380V; 3 phase
Working temperature: 85-100 ℃
Weight: 350 Kgs
Dimension: External Φ. 700 x H 2,100 mm
Remark: To save energy, the heater can be modified as a steam heating type.


General Info:
The tank is one of the essential auxiliary equipment for water-bath gelatin dissolving unit during the gelatindissolving process. As a essential heating mode during softgel encapsulation process, water-bath helps tokeep the viscosity of the gelatin liquid; yet the viscosity of gelatin liquid could only be stable under constanttemp. at 90-100℃. The tank meets the above requirement by a series of special design: serpentine heating,design ensure recycled use of hot water; outer tank layer is covered by super-fine glass cotton insulationlayer; and the outer cover is sealed with high quality stainless steel. The tank features convenient cleaningand good insulation function and is professional energy-saving heat exchange equipment.

LNG-II Vacuum Condensation Tank
Type: LNG-II
Condensation Area (m2): 60
Vacuum (Mpa): =/< 0.09
Size and Shape (mm): 400x1750
Product Number: 160110
Ex Factory Date: 2016-1-18

Skidding and Load out charges: There will be loading and skidding charges added to your purchase at market rates for your convenience.
Location: Fortworth, Texas

 

Skidding:$TBD

Loadout:$13,000



 

1- Gelatin Bio Reactor


No Mezzanine
Vacuum pressure in the vessel: 0.02-0.09 Mpa.
Working pressure in the vessel: 0.03-0.05 Mpa.
Examining Pressure in the vessel: 0.3-0.4 Mpa.
Working pressure in the jacket: 0.03-0.098 Mpa
Working temperature in tank: 50-100 ℃
Conveyor granule: 30 CP
Sealing parts and ring can be used for more than 3,000 continuous hours
The insulating layer uses super-fine glass cotton.
Inner vessel and insulation layer (covered layer) of the Tank, those sections exposed to raw materials are made of 1Cr18Ni9Ti stainless steel.
The jacket of the GDU uses high-quality steel.
The GDU and all stainless steel parts are well-polished.

General Information:


After ingredients are combined, the mixture is placed into a reactor called a Gelatin melter. The reactor surrounded by a thermal jacket heats the mixture while a very high torque turbine mixer stirs it under vacuum. At this stage, approximately 20% of gelatin mixture consists of water. 

Bioreactor design is a relatively complex engineering task, which is studied in the discipline of biochemical/bioprocess engineering. Under optimum conditions, the microorganisms or cells are able to perform their desired function with a limited production of impurities. The environmental conditions inside the bioreactor, such as temperature, nutrient concentrations, pH, and dissolved gases (especially oxygen for aerobic fermentation) affect the growth and productivity of the organisms. The temperature of the fermentation medium is maintained by a cooling jacket, coils, or both. Particularly exothermic fermentations may require the use of external heat exchangers. Nutrients may be continuously added to the fermenter, as in a fed-batch system, or maybe charged into the reactor at the beginning of fermentation.

RSQ II Coil Pipe Type Water Heater
Model: RSQ-II
Volume: 300 L
Temp. Control Range: 0-100 Degrees C
Mfg. Date: 2016-03
Product Code: 160308
Hot water volume: 2,000 kgs/h
Power consumption: 18 Kw; 380V; 3 phase
Working temperature: 85-100 ℃
Weight: 350 Kgs
Dimension: External Φ. 700 x H 2,100 mm
Remark: To save energy, the heater can be modified as a steam heating type.


General Info:
The tank is one of the essential auxiliary equipment for water-bath gelatin dissolving unit during the gelatindissolving process. As a essential heating mode during softgel encapsulation process, water-bath helps tokeep the viscosity of the gelatin liquid; yet the viscosity of gelatin liquid could only be stable under constanttemp. at 90-100℃. The tank meets the above requirement by a series of special design: serpentine heating,design ensure recycled use of hot water; outer tank layer is covered by super-fine glass cotton insulationlayer; and the outer cover is sealed with high quality stainless steel. The tank features convenient cleaningand good insulation function and is professional energy-saving heat exchange equipment.

LNG-II Vacuum Condensation Tank
Type: LNG-II
Condensation Area (m2): 60
Vacuum (Mpa): =/< 0.09
Size and Shape (mm): 400x1750
Product Number: 160110
Ex Factory Date: 2016-1-18

Skidding and Load out charges: There will be loading and skidding charges added to your purchase at market rates for your convenience.
Location: Fortworth, Texas

 

Skidding:$TBD

Loadout:$13,000



 

Nutra Equipment - TX/FL

Ends from

General delivery information available from the auctioneer

Skidding and Load out charges:
There will be loading and skidding charges added to your purchase at market rates for your convenience.

Important Information

AUCTION DATE: Lots start closing 4/16/24 10 am PST

LOCATION: Multiple Locations, Texas

INSPECTION: Please contact us to schedule. 818-495-3038 

 

PICKUP/REMOVAL:  Final Loadout is May 9th, 2023. 

 

18% Buyers Premium applies on all online purchases.  

 

 

  

BidSpotter Customer Service Support Department 

Have a question pertaining to the bidding process? 

Visit our Frequently Asked Questions!  

You can also start a live chat with a Bidspotter Support Representative by selecting Live Chat at the top of Bidspotter.com. More information on our chat system can be found by clicking here. 

Customer Support Hours:

  • Monday – Friday, 8:00 AM EST – 8:00 PM EST

Email: support@bidspotter.com

Office: (253) 858-6777      Toll Free: (866) 597-2437

Frequently Asked Questions

 

 

 

 

Terms and Conditions

Terms of Sale Agreement:

SELLER RESERVES THE RIGHT TO ACCEPT OR REJECT ANY AND ALL BIDS

  1. Only Credit Card, Wire Transfers or Cashier’s Checks payable to Chris Hillseth Enterprises (“CHE”) will be accepted for payment. No equipment will be removed from the sale site until payment is received by CHE. NO EXCEPTIONS! NO PAYMENT TAKEN ON SITE.
  2. CHE makes reasonable efforts to ensure that descriptions and other information are accurate. Bidders are strongly encouraged to verify any specifications and other information about equipment through consultation with independent experts or inspection by a qualified person. Any measurements provided, including shipping dimensions and weights, are approximate and/or estimated. Neither CHE nor the equipment owners make any warranties or guarantees. Under no circumstances will CHE or the seller be held responsible for any errors, omissions, discrepancies or inaccuracies. Everything is sold on an “AS IS/WHERE IS” basis with no warranties or representations whatsoever, either express or implied. WITHOUT LIMITING THE GENERALITY OF THE ABOVE, ANY AND ALL WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY OF GOODS ARE EXPRESSLY DISCLAIMED.
  3. For bidding approval, at its discretion, CHE may contact Bidders via email or telephone before to provide a deposit. Require a deposit of up to $10,000.00 USD (refundable without purchase) for lack of sufficient Bidspotter history e.g. first time Bidspotter registrant or negative Bidspotter history. Bidder will be notified if it is determined a deposit must be made. If CHE does not receive a response from its attempts to contact Buyer or if the Buyer does not provide a deposit, CHE reserves the right to refuse or cancel Buyer’s bids and re-sell Goods.
  4. Some items may have minimums or reserves. Therefore, bidder acknowledges they have been informed that Auctioneer may bid at the auction for its own account or on behalf of a third party or the seller.
  5. Purchaser hereby agrees to defend, indemnify and hold harmless auctioneer, Seller and their respective directors, officers, employees and other agents and representatives from and against any and all liabilities, judgments, claims, settlements, losses, damages, penalties, obligations and expenses, including attorney`s fees and expenses and other professional fees and expenses, incurred or suffered by such person arising from, by reason of, or in connection with any loss, damage or injury to person or property arising from, by reason of or in connection with the Goods sold hereunder. This indemnification shall survive delivery of the Goods to Purchaser and any subsequent sale or other transfer of the Goods to a third party.
  6. It is the buyers’ responsibility to secure all safety equipment to meet all applicable government safety standards in using or removing items purchased.
  7. Sales Tax will be added to the purchase of all taxable items. Dealers who purchase for resale must file their resale permit numbers. If sales tax is not collected at the time of sale and is deemed “needed to be paid” at a later date, buyer agrees to pay all required taxes.
  8. Purchaser does hereby indemnify and hold harmless auctioneer and seller from any and all damages, claims or liabilities from injuries to persons or property of any type whatsoever caused during the sale or by the removal of items purchased.
  9. Auctioneer and Seller shall have no liability to the purchaser due to non-delivery of any item for any reason other than to return to the Purchaser the monies deposited for non-delivered items.
  10. In the event the purchaser fails to pay the whole of the purchase within the time set forth by the auctioneers and/or fails to comply with any of the conditions or terms of sale, the seller may retain and/or recover the deposit specified as liquidated damages and, in addition thereto, items that are not paid for can be resold at public or private sale without further notice. Any deficiency resulting from such resale shall be paid to the auctioneers by the defaulting purchaser together with all charges, fees, and expenses incurred by such resale and enforcement of the obligation hereunder.
  11. The Bidder becomes solely responsible for all items purchased by him immediately following his winning bid at the auction. Therefore, he is advised to further guard and insure his items at his own discretion.
  12. No item can, on any account, be removed before buyer receives payment in full. Removal shall be at the expense, risk and liability of the purchaser. Auctioneers shall not be responsible for items not removed within the time allowed. If equipment is not removed within specified removal time, purchaser shall be liable for any moving and storage costs incurred and, if not so removed, the items shall be deemed abandoned.
  13. If any shortage exists on estimated counts, an adjustment will be made if claims are made at time of removal. No adjustment will be allowed after items are removed from the premises.
  14. If any dispute arises between two or more bidders, the sellers’ agent may or may not put the lot up again at once, and resell.
  15. The sellers’ agent, when acting as agent only, is not responsible for acts of its principals.
  16. A 18% Buyers premium will be applied to all sales in Addition to Applicable Local and State Sales Tax.
  17. By accepting a sale listing catalog and signing this form the buyer agrees to these terms and any announced terms at the sale.
  18. You will receive notifications from us regarding your purchases.
  19. Seller reserves the right to accept or reject any and all bids.
  20. All purchases of “regulated machines” will be reported pursuant to applicable Federal Regulations.
  21. All Bills must be completed on Day of Sale unless arrangements are made with Auction House prior to bidding.
  22. Full Payment at Termination of Sale.
  23. A 3% fee will be applied to all CC orders.
  24. Skidding and Load out charges: There will be loading and skidding charges added to your purchase at market rates.

 

Inspection date (day only) is:  

By Appointment Only. Call 818 495 3038 to Schedule.

Inspection locations:

Various Locations, call for specific item.

Inspection by appointment only. 

Call or Email Logan Hillseth logan@chrishillsethenterprises.com or Patrick Hillseth at (818)495-3038 patrick@chrishillsethenterprises.com

See Full Terms And Conditions